Update On The Public Service Announcement

Though the permit issued by the MPRB states from 6:30 to 8:30 pm the Stone Arch Bridge area has been posted with signs stating it is closed from 4:00 to 10:00 pm. Does this mean that the MPRB is getting shorted cash they claim they are in such desparate need for to keep our system running?

Check out the attached picture of the posted signs.

AttachmentSize
Closed Sign.pdf574.5 KB